    Hi, new here with a question that may have been asked a few times - sorry if that's the case.

    We have 10 x Grafik Eye QS units serving 10 separate rooms in a large domestic property. They're all as stand alone basic systems just controlling room lighting (no blinds, etc). Each room has 2 or 3 wall scene selectors but they are wired to that room's Grafik Eye QS unit only (not linked to any other Grafik Eye QS unit).

    Our client would like to have one controller placed at the main exit of the property that would shut down all 10 Grafik Eye units (if they're left switched on). Is that easily done ? And if so, how ? We would still want each room to work independantly but just have the option to switch them all off when leaving the propoerty without going through the house checking they're all off (kids leave them on all the time).

    The 10 main units are all within the same area in the basement and wiring between them would be simple.

    Many thanks for any advice.

    Andy

  2. #2
    Junior Member
    Join Date
    Nov 2015
    Posts
    3
    Sounds like it would work if you wire all the Grafik Eyes together and then to a keypad at the exit. You would have to program the keypad to talk to all the Grafik Eyes. You may also have to reprogram the existing keypads in the rooms to tell them which Grafik Eye to control after wiring them all together.

    If the Grafik Eyes have wireless capability, you may be able to program a pico at the front door to control the grafik eyes.

  3. #3
    Authorized Lutron Contributor
    Join Date
    Apr 2013
    Posts
    403
    You achieve this by having a QSWS2-2BN-WH-EGN at the front of the property but they would have to link all (10) Grafik Eyes and keypads together and program the 2B control to talk to all (10) units as an scene 1/off. Using a wireless pico is an option if the Grafik Eyes are within range of the wireless pico (30 ft. through walls or 60 ft. line of sight) and if the Grafik Eyes are QSGRJ's. The wireless pico will not work with a QSGR.

  4. #4
    Junior Member
    Join Date
    Nov 2021
    Posts
    1
    Quote Originally Posted by AJ3XX View Post
    Hi, new here with a question that may have been asked a few times - sorry if that's the case.

    We have 10 x Grafik Eye QS units serving 10 separate rooms in a large domestic property. They're all as stand alone basic systems just controlling room lighting (no blinds, etc). Each room has 2 or 3 wall scene selectors but they are wired to that room's Grafik Eye QS unit only (not linked to any other Grafik Eye QS unit).

    Our client would like to have one controller placed at the main exit of the property that would shut down all 10 Grafik Eye units (if they're left switched on). Is that easily done ? And if so, how ? We would still want each room to work independantly on seriale latimp but just have the option to switch them all off when leaving the propoerty without going through the house checking they're all off (kids leave them on all the time).

    The 10 main units are all within the same area in the basement and wiring between them would be simple.

    Many thanks for any advice.

    Andy
    check that page and get the solution..:

  5. #5
    Junior Member
    Join Date
    May 2021
    Posts
    2
    checked! but actually it doesn't have solution like you've said.

  6. #6
    Junior Member
    Join Date
    Feb 2023
    Posts
    1
    Quote Originally Posted by AJ3XX View Post
    Hi, new here with a question that may have been asked a few times - sorry if that's the case.

    We have 10 x Grafik Eye QS units serving 10 separate rooms in a large domestic property. They're all as stand alone basic systems just controlling room lighting (no blinds, etc). Each room has 2 or 3 wall scene selectors but they are wired to that room's Grafik Eye QS unit only (not linked to any other Grafik Eye QS unit).

    Our client would like to have one controller placed at the main exit of the property that would shut down all 10 Grafik Eye units (if they're left switched on). Is that easily done ? And if so, how ? We would still want each room to work independantly nursing papers examples but just have the option to switch them all off when leaving the propoerty without going through the house checking they're all off (kids leave them on all the time).

    The 10 main units are all within the same area in the basement and wiring between them would be simple.

    Many thanks for any advice.

    Andy
    Did you find the answer to your question?

  7. #7
    Lutron Technical Support
    Join Date
    Sep 2020
    Posts
    23
    The solution was written out earlier by Craig which involves tying all the Grafik eye QS's together via a single 2 button keypad or a pico remote. The issue with this is that it will control them all at the same time which might be undesirable. A smaller scale solution would be using motion sensors for each Grafik eye to actively look for lack of activity and prompt the zones to shut off automatically. Additionally, if this was part of a Homeworks QSX system you could just simply use the phone app to turn everything off remotely.

  8. #8
    Carmelite Chapel is a serene and sacred space nestled https://carmelitechapel.com/ in the heart of downtown Houston. This hidden gem offers a peaceful sanctuary for individuals seeking solace, reflection, and spiritual connection. The chapel's beautiful architecture and tranquil atmosphere create a sense of reverence and awe, inviting visitors to pause, pray, and find inner peace. With a rich history rooted in the Carmelite tradition, this chapel serves as a beacon of hope and faith in the bustling city. Whether you are looking for a moment of quiet contemplation or a place to deepen your spiritual practice, Carmelite Chapel offers a sacred space for all seekers.

  9. #9
    Junior Member
    Join Date
    Aug 2024
    Posts
    3

    health therapy

    Been wondering how quickly sermorelin starts showing results, and I found a great article explaining the timeline. It breaks down what to expect in the first few weeks and how the effects gradually improve. The guide really helped set realistic expectations for those starting sermorelin therapy. If you’re curious about how fast it works, check out this detailed explanation: https://valhallavitality.com/blog/ho...ermorelin-work . It gave me a clearer picture of the progress timeline.

Similar Threads

  1. Grafik Eye QS IR Control
    By domino in forum 3rd-party Integration - Controls
    Replies: 5
    Last Post: 10-10-2018, 01:23 PM
  2. Total control and CCP Gen2 - Driver
    By Utopia in forum 3rd-party Integration - CAS
    Replies: 3
    Last Post: 07-22-2014, 11:14 PM
  3. Grafik Eye + QSE IO
    By Petar in forum 3rd-party Integration - Legacy HW
    Replies: 2
    Last Post: 06-02-2014, 02:14 AM
  4. Grafik Eye QS vs WPM?
    By schalliol in forum Design Assistance - RA2
    Replies: 2
    Last Post: 05-15-2014, 01:16 AM
  5. Grafik Eye
    By Petar in forum Troubleshooting - Legacy HW
    Replies: 6
    Last Post: 04-25-2014, 07:59 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •