Here are a few of the beefs that I have with the load schedules in QS
  1. You can't sort the load schedule by zone number. In HomeWorks I used the sort function to quickly find the next available zone number if I lost track while designing a project.
  2. The load schedule prints by room that is ok but each room is on a separate page. The problem here is that I print the schedules to a PDF and insert the PDF in an AutoCAD drawing since every room is a separate page (some pages only having a couple of loads) there are too many pages taking up too much space on a plan page.