I’m trying to replace the mechanical switch installed for some under cabinet lights. The contractor appears to have ran each side of the kitchen separately and brought both load wires into a single Leviton switch (1 to a “quickwire termination” and the other to the screw). When I connect both of them to the red wire on my PD-5ANS then nothing works. Ideas? Suggestions?